Althana group has vast experience in plot development, padding works for gas manifolds, gas stations and for rigs with PDO, OXY, OQ and other oil & gas industries. Right of Way for gas pipe line project trench work by manual, with equipment and trencher machine, pre padding , post padding, back filling and windrow making.
We are specialized in steep slope trench cutting works in hilly terrain and have completed more than 100 km ROW, trenching & back filling works with GPS/OQ for 32" gas pipeline projectAlthana group has skilled work force to undertake, all types of cast in situ & precast concrete works.
• Concrete for Road works, Box culverts, Barriers,Retaining wall, Under pass etc.
• Concrete, Rip Rap, Gabion, & other protection work for 3rd lane from Al Mawaleh Interchange to Bait Al Barka Roundabout Lot(2)
• Replacement of Existing HDPE manholes with RCC manhole on live Sewerage network 53 Nos.